LOCAL NEWS • EVERY DAYTHE TWIN PIKES & TWO RIVERS
RiverNewsLive original masthead
LOCAL NEWS

DEMOLITION PROJECT MOVES FORWARD AT HANNIBAL'S FORMER ST. ELIZABETH HOSPITAL

From the Eagle Valley Bank 24-Hour News Center •
DEMOLITION PROJECT MOVES FORWARD AT HANNIBAL'S FORMER ST. ELIZABETH HOSPITAL

HANNIBAL, Mo. — The long-awaited project to remove the former St. Elizabeth Hospital at 109 Virginia Street continues to advance through demolition preparation and hazardous-material work.

The century-old hospital has sat vacant for decades. City officials have moved to address deterioration and safety concerns surrounding the property, and demolition planning has included neighborhood access changes and precautions for nearby residents.

In June, Hannibal officials approved contracts covering building demolition, engineering and hazardous-material removal. The demolition contract with GreenTrac LLC was valued at approximately $1.4 million.

The city held public meetings in July to explain the project's timetable and safety measures. Hazardous-material abatement began during the summer, ahead of the building's physical removal.

An October 6 City Council agenda also included a change order related to the hazardous-material removal contract with General Waste Services. That administrative action indicates the project remains active, although a confirmed date for completion of the physical demolition has not been established in the available city records.

The removal of the long-abandoned structure represents a major redevelopment and neighborhood safety milestone for Hannibal, where the future of the former hospital property has been debated for years.

Share on FacebookEmail story
← Back to RiverNewsLive headlines